We were in the area waiting for Mother's Day dinner, so we decided to pop up to our unit for me to take a look at the renovation progress.
The lighting contractor was present installing the lights.
Floor protection removed for living/dining/kitchen areas. Still on for bedrooms. The actual aircon units were already mounted, so were the ceiling lights in the bedrooms.
Aircon unit and ceiling light installed in Bedroom 3 (Study) | Aircon unit and ceiling light installed in Bedroom 2 (Baby room) |
The downlights in both toilets were also up.
Master Toilet | Common Toilet |
Aircon, Cove lightings and downlights in living and dining rooms were already installed, but the contractor was still working on the dining area hanging light.
No comments:
Post a Comment